Immediate Needs Upgrade
About Project
The project at Osler Drive in Hamilton dealt with the upgrade of a new fill station with spill containment. This involved the installation of two new storage tanks, along with a chemical dosing skid with a new panel which included metering pumps and a control panel. The project also involved replacing the main door with a new double door.
.