Capacity Upgrades
About Project
This project included the removal of existing submersible pumps and installation of two new submersible pumps, along with the installation of a safety platform and access ladders in the wet well. A temporary bypass pumping station was installed and operational during the removal and installation of the submersible pumps. Modifications were made to the wet well top slab to provide a level device access box and a base for a portable davit.